COMPLETED PROJECTS:
Turkcell-Ericsson, GSM Project, 45 Turnkey Base Stations Installation ( 1998-1999 )
Nortel Networks, GSM Project, 100 Base Stations Site Acquisition&Renting (1998-1999 )
Nortel Networks, WLL Project, 500 Base Stations Site Acquisition&Renting (1998-1999 )
Alcatel, GSM Project, Base Stations Site Acquisition&Renting (1998-1999 )
Rumeli Telecom(Turkish Republic of Northern Cyprus),GSM Project, 27 Base Stations Installation(1999-2000)
Telsim, GSM Project,60 Base Stations Installation(1999-2000 )
Nokia, GSM Project, 150 hop Minilink LOS Surveys (2000)
Aria-Siemens-Tekno Sistemi,GSM Project, 30 Sites Acquisition&Renting(2001)
Marconi-Botaş,Backbone Microwave Project,7 Sites Installation&Integration (2001-2002)
Aria-Pfleiderer,GSM Project,11 Base Stations Installation(2001-2002)
Aria-Acterna,GSM Synchronization Project,14 Sites Installation&Integration (2002)
Avea-Netaş/Nortel-Palmet,GSM Project,63 Turnkey Base Stations Installation (2002-2006)
Satko,Satellite Maintenance Project (2002-2005)
Turk Telecom-Nera-Palmet,SDH Radio Long Houl Project, 152 hops Site Survey (2004)
Turk Telecom-Huawei,CDMA Project, 4 Trial Base Stations Installation(2004)
Turk Telecom-Ericsson,SDH&PDH Radio Project,44 hops MW Installation& Commisioning (2005-2006)
Vodafone-Motorola-Aneltech,GSM Project,25 Sites Swap Works (2007)
Vodafone-Motorola-Aneltech,GSM Project,9 Base Stations Installation (2007)
Vodafone-Motorola,GSM Project, 15 Base Stations Installation (2007-2008)
Vodafone-Motorola,GSM Project, 10 TT Sites Unbreakable Power Supply Installation(2008)
Vodafone-Motorola,GSM Project, 15 Base Stations Revision Works(2008)
Vodafone-Motorola,GSM Project, 34 Sites AC Power Remote Reading Access Installation (2008)
Vodafone-Motorola,GSM Project, 16 BSC Sites EAS Alarm Installation(2008)
Vodafone-Motorola,GSM Project,Approximately 300 hops MW Installation,Commisioning,Transmission,Integration and Dismantle Works (2008-2009)
Aselsan, Gendarme Jemus Project, 2 Trial Base Stations Installation(2009)
Avea-Zte,GSM Project, 20 3G Trial Sites Dismantle Works(2009)
Vodafone-Huawei,GSM Project,2 PTN Installation,Commisioning and Integration Works (2010)
Vodafone-Huawei,GSM Project,28 Node B Installation,Transmission,Commisioning and Integration
Works (2010)
Vodafone-Huawei,GSM Project,15 MW Installation,Transmission,Commisioning and Integration and
Dismantle Works (2010)
|